ROVworld Subsea Information

Powerful and Silent Subsea Thrusters

Inspection: Pipe technology performs for Angola

Posted on 09.08.2006 - 08:41 UTC in INSPECTION NEWS (Subsea) by Rons_ROV_Links

Pipe technology performs for AngolaRemote pipeline flooding and pigging operations for Chevron’s Lombito Tomboco project offshore Angola have been completed by an Aberdeen-based technology specialist using ROVs.

Norson Services has successfully carried out the work for the deepwater project which involved ROV-operated flooding and pigging a total of 15 three to 12-inch subsea flowlines between 4 and 9 km (2.5 to 5.6 miles) long at a water depth of 550 m (1,970 ft).

Norson used its Remote Flooding Module and Subsea Hydrotest pump technology to carry out the work, on behalf of Chevron and main sub-contractor Subsea 7.

“The benefit of our remote system is that it is ROV friendly and removes the need for connection to a surface vessel, thus saving substantial costs and time,” said Les Graves, director of Norson’s pipeline division.

August 9 ,2006


~~~~~~~~~~~~~~~~~~
Offshore Shipping Online
~~~~~~~~~~~~~~~~~~

Share:
click Related        click Rate This        click Share
Search ROVworld NEWS

Site Info
 
Poll ?
How many days did you work offshore in 2016? (All votes anonymous)




Results
Polls

Votes 724
ROVworld Feeds
 
Facebook

ROVworld.com - ROV News, Discussions, Jobs and more