ROVworld Subsea Information

Register Today for Underwater Intervention 2017

Offshore News: Damaged Pipe Causes Production Shut Down on Troll C

Posted on 26.08.2014 - 07:00 UTC in OFFSHORE NEWS by ginamc

Statoil Statoil shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system.


Troll C Platform The corroded pipe will be replaced. This is expected to require a 7-day shutdown.

 

Troll C has a daily equity production of some 58 000 barrels of oil , and exports 8 million cubic metres of gas. In addition some 34 000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Share:
click Related        click Rate This        click Share
Search ROVworld NEWS

Site Info
 
Poll ?
How many days did you work offshore in 2016? (All votes anonymous)




Results
Polls

Votes 632
ROVworld Feeds
 
Facebook

ROVworld.com - ROV News, Discussions, Jobs and more