ROVworld Subsea Information

UI 2017 Trade Show Registration

Aker Solutions to supply three subsea production control umbilicals for Chevron

Posted on 04.07.2011 - 12:00 UTC in SUBSEA TELECOMS NEWS by Rons_ROV_Links

Aker Solutions to supply three subsea production control umbilicals for ChevronAker Solutions has been selected to supply three subsea production control umbilicals for the Chevron operated Jack & St. Malo field developments in the Gulf of Mexico. Contract value is undisclosed.


The production control umbilicals will provide hydraulic, electrical and fiber optic service to the Jack and St. Malo subsea fields. Scope of work includes three electro-hydraulic steel tube production umbilicals totalling 40 miles (65 kilometres). Engineering, project management, and manufacturing will take place at Aker Solutions' state-of-the-art umbilical facility in Mobile, Alabama. The three umbilicals will be used at Chevron's Jack & St. Malo field, located in the Walker Ridge Area of the Gulf of Mexico in water depths of approximately 7,000 feet (2,100 metres).

"Aker Solutions is excited to see Chevron come back to us with a repeat order and is proud to contribute to this very important project for Chevron and for the Gulf of Mexico region," said Erik Wiik, President - Subsea North America, Aker Solutions.

Opened in 2003, Aker Solutions' umbilical manufacturing facility in Mobile is strategically located to serve the Gulf of Mexico and global markets. The facility, with its high capacity horizontal cabler, is specially designed to meet the challenges of demanding deepwater applications.

Share:
click Related        click Rate This        click Share
Search ROVworld NEWS

Site Info
 
Poll ?
How many days did you work offshore in 2016? (All votes anonymous)




Results
Polls

Votes 634
ROVworld Feeds
 
Facebook

ROVworld.com - ROV News, Discussions, Jobs and more