ROVworld Subsea Information

Deep Trekker Micro ROV Remotely Operated Vehicle

Van Oord contract awarded for pipeline installation in the Emirate of Fujairah

Posted on 23.12.2008 - 13:00 UTC in CONTRACT AWARDS by Rons_ROV_Links

Van Oord contract awarded for pipeline installation in the Emirate of FujairahVan Oord Offshore signed the Subcontract for the Abu Dhabi Crude Oil Pipeline Project (ADCOP) - Offshore Pipeline and Facility.

The Abu Dhabi Crude Oil Pipeline will originate from Habshan in Abu Dhabi and terminate in Fujairah, both located in the United Arab Emirates. The pipeline has been designed to transport 1.5 Million Barrels of Crude Oil Per Day (MMBPD) from the Company for Onshore Oil Operations Facilities (ADCO) over a distance of approximately 370 km to the Main Oil Terminal for export through the Offshore Loading Facilities.

The Subcontract is awarded for the Engineering, Procurement and Construction (EPC) of the Offshore Works. The works include the offshore installation of 3 pipelines with a total length of approximately 13 km and 3 Single Point Mooring Systems (SPM's). All three pipelines need trenching and backfilling. The project will be executed in joint venture with Bluewater who will supply the SPM's and associated engineering.

The execution of the works shall take place in 2009 and will be completed by the second quarter of 2010.

The Ultimate Client is the International Petroleum Investment Company (IPIC) and the Main Contractor is the China Petroleum Engineering & Construction Corporation (CPECC).
Share:
click Related        click Rate This        click Share
Search ROVworld NEWS

Site Info
 
Poll ?
How many days did you work offshore in 2016? (All votes anonymous)




Results
Polls

Votes 687
ROVworld Feeds
 
Facebook

ROVworld.com - ROV News, Discussions, Jobs and more