ROVworld Subsea Information

Damaged Pipe Causes Production Shut Down on Troll C
Date: Tuesday, August 26, 2014 @ 08:00:00 EDT
Topic: OFFSHORE NEWS


Statoil Statoil shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system.



Troll C Platform The corroded pipe will be replaced. This is expected to require a 7-day shutdown.

 

Troll C has a daily equity production of some 58 000 barrels of oil , and exports 8 million cubic metres of gas. In addition some 34 000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.







This article comes from ROVworld Subsea Information
http://www.rovworld.com

The URL for this story is:
http://www.rovworld.com/modules.php?name=News&file=article&sid=6774